Home Sauna

Home » Home Sauna » Far Infrared Sauna

Step by Step Installation Instructions for Corner Sauna

With the assistant of the installation manual and a little patient, you will be able to assemble the home sauna system in just 30 minutes!

Installation procedure


Sauna Room: 

  1. Structure of Infrared Sauna. See FIG-1

  2. One unit packed into two cartons. See FIG-2                                                                                                                 

    FIG-2 Two cartons
    FIG-2.1 carton no.
    Make sure all parts are present before installing the unit. See packing list below.
    A. User manual   B. Bottom board      C. Back Board     D. Left side board   E. Right side board   F. Sitting baffle    G. Sitting board      H. Back rest       I. Front board      J. Internal top board K. External top board   L. CD Player   M. CD player back cover  N. Screwdriver   O.  Towel shelf   P. Left back side board  Q. Right back side board
  3. Place the bottom board in the desired location of your sauna, and make sure which side is the front and which side is the back. See FIG-3.                                                                                                       
    FIG-3 Placing bottom floor
    FIG-4 Assembling left back-side board
  4. Align the left backside board with bottom board’s corresponding battens; make sure they are in line. Assemble the left board and right board by using the latching. See FIG-4.


    FIG-5  Latching

  5. The latch has a guide tab that must be placed in the guide slot for alignment. Pick up the back panel (hold it upright to the floor panel) and place the tab in the slot, do not latch at this time. When the back wall and the front wall/side wall are set together on the floor panel, close and pin the latches. See FIG 5.
  6. Align the right side board with bottom board’s corresponding battens, make sure right side board fits flush into right back-side board. Latch it. Do the same way when assemble the left sideboard. See FIG-6.
  7. Hold the long sitting baffle with heater along the left backside board, and the right side board’s corresponding slot then place it vertically into these slots. Note: Please make sure this board is in the slot; otherwise the sitting board will become unstable. See FIG-7.                                                                                                                 
    FIG-6 Assembling the left and right side boards
    FIG-7 Assembling long sitting baffle
  8. Hold the short sitting baffle along the left and right sideboard, and the short sitting baffle’s corresponding slot then place it vertically into these slots. Notes: Do make sure this board is in the slot; otherwise the sitting board will become unstable. See FIG-8.
  9. Connect the electrical wire in the left and right backboard with corresponding wire in the sitting baffle. Note: Please make sure they are tightly connected; otherwise the heater will not work. See FIG-9.                                                                                                                                                                                                                             
    FIG-8 Assembling short sitting baffle
    FIG-9 connecting the wire
    FIG-10 Assembling sitting board
    FIG-11 Fix the backrest with screws
    FIG-12 Assembling front board
    FIG-13 Assembling the inner top board
  10. Put the sitting board horizontally on corresponding battens of the right backside board. See FIG-10.
  11. Screw the backrest onto the backboard.  See FIG-11
  12. Align the front board with bottom board’s corresponding battens, and then latch it with the left and right boards respectively. Note: Take caution of the glass door to avoid damage. See FIG-12.
  13. Open the door, raise the top board high enough to see if it fits with the surrounding boards, and then put down.
  14. During the course of putting down the internal top board, make sure all the wires (mentioned above) and connecting plugs are slipped through the corresponding holes of the top board. All these wires will be led into connecting with the controller on the internal top board. See FIG-14.
  15. All the infrared heaters are pre-assembled. See FIG-15. Connect all the wires and connectors to the corresponding outlets on the top board. Please be sure that all the plugs are connected tightly.                                                                                                                 
    FIG-14 put through the wire
    FIG-15 linker on the outer top board
  16. After that, put down the power plugs of the speakers, temperature sensor, control panel and CD player through the hole near the fan on the top board. See FIG-16


    FIG-16 Leading the wires of heaters onto the board through the corresponding hole

  17. Take out the car stereo with CD player, check its spare parts, put the stereo into the CD frame. Then screw the attached stereo support to the stereo. See FIG-17, 17.1, 17.2, 17.3 Note: CD player on selected model only.                                                                                                                                                     
    FIG-17 Checking CD spare parts
    FIG-17.1 Fixing CD
    FIG-17.2 Fix the CD to the metal support
    FIG-17.3 Lock the CD
    with its metal support
  18. All the wirings from top board should be linked with corresponding connectors of the control panel, the CD player, the temperature sensor and the radio antenna. Otherwise, the sauna will not function if any connections are missed. See FIG18-21.                                                                                                                                                     
    FIG-18 Link the CD
    connectors
    FIG-19 Link the sensor
    connectors
    FIG-20 Link the control
    panel connectors
    FIG-21 Link the antenna
    connectors
  19. Take down the bag of screws affixed to the CD box; use a cross screwdriver to screw in the CD Box over the CD player. See FIG-22, 22.1                                                                                                                 
    FIG-22 CD player back cover and screws
    FIG-22.1 Fix the CD player back cover with screws
  20. Making sure all steps are finished correctly, plug in the power and try using the sauna at first to make sure it will work properly. Then put the external top board over the internal top board, and take out the power plug through the corresponding hole in the external top board. See FIG-23.                                                                                                                 
    FIG-23 Take out the power plug through external top board
    FIG-24 Fix the external
    board with screw
  21. Take the screws affixed on the external top board, then set up the board using the cross screwdriver. See FIG-24.
  22. Installation completed.

User Tips ? Add tips